Service Implementation Process

 

page-950-1000

1. Preliminary Technical Consultation:

Starting from the client's silo construction requirements, we conduct on-site surveys and measurements using drones. By understanding the site conditions and adapting to local circumstances, we develop a comprehensive plan. This includes determining a simplified process flow, the basic form, and preliminary specifications for steel silos. We prepare multiple budget comparisons, continuously optimize the plan, and ultimately finalize the solution.

page-950-1000

2. Business Phase:

Business negotiation, contract signing

page-950-1000

3. Design Phase:

Utilize technologies such as AutoCAD and PKPM BIM 3D digital design platforms to guide drawing design and simulate the entire on-site construction process.

page-950-1000

4. Prefabrication Phase:

Complete prefabrication of silo roof components, silo body accessories, and auxiliary steel structures within the workshop. Perform self-applied anti-corrosion painting and sheet metal modification..

page-950-1000

5. Construction Phase:

Construction equipment and materials are delivered to the site for fabrication and installation.

page-950-1000

6. Completion Stage:

Upon completion of fabrication and installation, the steel silo products are delivered to the customer.

page-950-1000

7 Acceptance Phase:

Assist the owner in installing and commissioning auxiliary equipment for steel silos.

page-950-1000

8. Post-Sales Phase:

Training on the operation of steel silos.